[Case Study] Bogibeel Bridge: Asia’s Second Longest Rail-Road Bridge

In today’s age of developing technology and structures, bridges represent an important part of the transport structure. Historically, bridges have been vital transportation routes, connecting communities and shortening routes across our world. As a major lifeline in the present time and in modern cities, health monitoring of bridges becomes an essential task.

In this article, we will be taking an in-depth look into the Bogibeel Bridge monitoring work carried on by the Encardio team.

Let’s have a look!

Project Overview – Bogibeel Bridge

Known as the second-longest Rail-cum-Road Bridge, the Bogibeel Bridge spreads over the Brahmaputra River in the northeastern region of India. The 4.94 km bridge is built across the Dhemaji and Dibrugarh districts of Assam, India, and aims to reduce the train travel time between Delhi to Dibrugarh by about three hours. It will also provide direct connectivity from Dibrugarh to Itanagar, reducing the travel distance by 705km.

The Bogibeel Bridge is additionally recognized as the 5th longest bridge in India.

The Bridge is designed for the easy movement of transportation from Dhemaji to major hospitals, education institutes, and the Dibrugarh airport. It will also enhance the national security of the eastern region of India by providing a swift movement of the defense forces.

Since the Bogibeel Bridge is located in an earthquake zone, it is one of the first bridges to have welded steel-concrete beams/trusses construction which holds the ability to withstand an earthquake of magnitude up to 7 on the Richter Scale.

The bridge is constructed as a two-lane rail track on the lower deck and the upper deck consists of three lanes. The bridge has been designed in such a way that it can easily transport army troops/tanks, and even fighter jet landings.

Why did Bogibeel Bridge need Monitoring?

Like any other structure, Bogibeel Bridge needed maintenance and monitoring work to ensure that everything was functioning as per the required level.

The bridge features a total of 39 spans of 125 m each along with 2 end spans of 32.4 m each. Among these spans, one normal span and one end span on the North bank needed a load test to gauge the over-range capacity of the bridge.

The load test was carried out during the commissioning stage of the bridge, where instrumentation was required for the real-time monitoring of the load test. Geotechnical instruments like Strain Gauges, displacement sensors, and thermocouples were employed for the testing of the strain developed at full load, and the variation of temperatures and displacement of the bearings of the bridge span.

Encardio Rite was responsible for the complete monitoring task of the Bogibeel Bridge.

Monitoring Solutions offered by Encardio Rite – Bogibeel Bridge

Let’s take a look at the monitoring solutions provided by Encardio Rite and then move on to discuss the instruments installed by the team.

As mentioned in the previous section, load testing was required at a normal span of 125m and an end span of 32.4 m on the North bank.

The required geotechnical instruments were installed in order to collect the automated data before and after the load application. This was done to monitor the variations and load impact including the characteristics and responses of the bridge like temperature, displacement and geometry profiles of the bridge deck, static stress/strain distribution, and overall performance for the load test.

Here are the Turnkey Services provided by Encardio Rite:

  • Encardio Rite supplied sensors, data loggers, weather stations, and geodetic targets for the monitoring process.
  • The instruments were installed and commissioned by the team
  • Automatic Monitoring was made possible with the data loggers
  • Real-time monitoring was offered with the help of a web-based data management system

Instrument Used- Bogibeel Bridge

Let’s take a look at the instrument used for the monitoring of the existing Bogibeel Bridge.

Strain Gage:

Strain Gauges were used for the strain measurement on the midpoints/endpoints of trusses as lower main chords, diagonals, and top cross girders.

Displacement Sensors:

These were used for the accurate monitoring of displacement at the center-line of bearing (fixed and free) and structural member of the truss as well as across the expansion joints between the two spans.

Prism Targets:

Prism Targets were employed for the reliable monitoring of the X-Y-Z movements on the picked lower main chords.

Thermocouples:

The geotechnical instrument was used for the measurement of the steel surface and concrete temperatures and was installed on the midpoints of trusses as lower and upper main chords.

Automatic Weather Station

The Weather Station, as expected, was used to keep a look at the wind direction and speed, temperature, and humidity.

Data Acquisition System :

The System engaged in the automatic collection and transfer of the monitored data to the cloud server with web-based data management software.

Installation Challenge – Bogibeel Bridge

The challenge was the enormous amount of groundwork the project demanded to achieve the results. 170 strain gauges, 124 thermocouples, 6 displacement sensors, and 8 prism targets were installed on the top cross girder mains and intermediate, diagonal girder, and bottom chord girder of the normal span and end span. All this was done in a very short period, which was challenging.

Apart from this, the automatic weather station was installed at the center of the normal span which was used to monitor the entire weather parameters. All the installed sensors, including the weather station, were connected to an Automatic Data Acquisition system for real-time data.

The installation team was given 10 days to carry out the installation and commissioning work. On top of it, the installation location was quite difficult, where the Encardio Team Engineers used trolleys and suspended buckets to reach the location where the sensors had to be installed.

Another installation challenge faced by the team was to install the arc weldable strain gauge without the welding as it was not allowed on the truss members. To do the needful, special epoxy was then used for the installation.

To install the displacement sensor at fixed and free bearing, above the pier of the bridge, a special arrangement was designed by the team. At the end of 10 days, the enormous task of installation, adaptation, and commissioning of over 300 sensors was successfully completed.

Achievement and Results – Bogibeel Bridge

The Bogibeel Bridge Monitoring work was completed, and the span load test and monitoring results confirmed the assumption made before the test. As per the designer Ramboll, the monitoring results matched the expected values, and no abnormality was found between the highway deck and the railway bridge.

A combined static load test including both highway and railway loadings was performed. The station load test was carried on in different categories, namely:

  • Deck (Highway loading)
  • Tracks (Railway loading)
  • Combined Deck and Track loading

Deck load testing

For the deck load tests, the loading was increased in a paced manner by placing concrete blocks and structural pieces on the structural frames at designated locations.

The difference in the strain distribution through the structure, displacement, and geometry profiles of the bridge and the ambient temperature, concrete temperature, and steel temperature in the body was monitored through the loading and unloading, and the full load and no-load was observed for 24 hours.

Longitudinal displacement of the bearing and expansion joints were also monitored.

 

 

 

 

 

Track load testing

For the track load testing, the loads were provided in the type of train engine and wagons. Apart from this, the loading procedure was similar to the deck load explained above. Similarly, all the instruments were installed on the steel structure, bearings, and expansion joints and monitored accordingly.

 

 

 

 

 

 

 

Combined track and deck load testing

For the combined track and deck load testing, concrete blocks, engine with wagons, and steel structures were loaded on the railway track and highway deck simultaneously.

The load test was carried out for two segments:

  •  TLT1 – This was carried on with the engine and wagons parked on both railway tracks, with a loaf of 2016 tons.
  • TLT2 – This kind of segment was done with engines and wagons parked on one railway track, with a maximum load of 969.30 tons.

Encardio Rite’s Web-based data management software DRISHTI was used to monitor the real-time change in strain, displacement, and temperature due to the incremental loads.

In the end, the effect of the morning temperature (high), sunrise, sunset, and night temperature (low) along with winding on strain measurement, displacement measurement, and temperature measurement displayed the results as per the expected variations.

This brings us to the end of our case study article on Bogibeel Bridge. Watch this space for more such articles.

Got unanswered questions? Ask

Direct To Your Inbox !

Subscribe to our monthly newsletter and get access to the latest industry trends, insights & updates.