Bangalore Metro Phase 2 Monitoring
Phase 2 alignments traverse mixed ground regimes with tight vertical tolerances beside operating infrastructure.
Monitoring arrays linked optical levelling loops, vibrating wire piezometers, and inclinometer casings spanning retained cuts.
| Project Details | Bangalore Metro Phase 2 Monitoring |
|---|---|
| Location | Bangalore, Karnataka |
| Client | Bangalore Metro Rail Corporation |
| Year | 2021 |
- Staging – Instrumentation phased with excavation sequencing.
- Vibration – Baseline readings near heritage and sensitive adjoining structures.
- QA – Auditable datum networks for contractor sign-off milestones.