Mumbai Metro Line 3 Project

Mumbai Metro Line 3 Project

Mumbai Metro Line 3 Project

The Line 3 of the Mumbai Metro, also known as Colaba-Bandra-Seepz Line, is a part of the metro system under construction (as of 2021) in Mumbai, India. When completed, the 33.5 km long line will be the first underground metro line in Mumbai and will be operated by MMRC. The metro line will connect Cuffe Parade business district in the extreme south of the city to SEEPZ in the north-central with 26 underground and one at-grade station. The tunnel alignment will consist of twin tunnels 5.5 m in diameter each, at a depth of 20-25 m below ground. Seventeen tunnel boring machines are being used, to construct these tunnels.

Encardio-rite was entrusted with the dilapidation survey and instrumentation and monitoring works for all the packages by respective Contractors. Scope of works for different packages is briefed below:

Contract UGC-01 (Cuffe Parade – CST)

Tunnels & 4 stations at Cuffe Parade, Vidhan Bhavan, Churchgate & Hutatama Chowk

Contractor: Larsen & Toubro Ltd – Shanghai Tunnel Engineering Co. Ltd

Encardio-rite was given sub-contract for:

  • Dilapidation (pre-construction building condition) survey of hundreds of buildings within zone of influence of excavation works and tunnel alignment
  • Supply and installation of geotechnical and geodetic monitoring instrumentation for underground stations and tunnels 
  • Supply and installation of geotechnical and geodetic monitoring instrumentation for sensitive buildings within  zone of influence of excavation works and tunnel alignment
  • Monitoring services with daily, weekly  and monthly monitoring

Contract UGC-02 (CST – Mumbai Central)

Tunnels and 4 stations at Chhatrapati Shivaji Terminus, Kalbadevi, Girgaon & Grant Road

Contractor: OSJC Moscow Metrostroy – Hindustan Construction Co.Ltd

Encardio-rite scope of works included:

  • Dilapidation (pre-construction building condition) survey of hundreds of buildings within zone of influence of excavation works and tunnel alignment
  • Supply and installation of geotechnical and geodetic monitoring instrumentation for underground stations and tunnels 
  • Supply and installation of geotechnical and geodetic monitoring instrumentation for sensitive buildings within  zone of influence of excavation works and tunnel alignment

Contract UGC-03 (Mumbai Central – Worli)

Tunnels and 5 stations at Mumbai Central, Mahalaxmi, Science Museum, Acharya Atre Chowk & Worli

Contractor: DOGUS – SOMA Enterprise Ltd.

Encardio-rite scope of works included:

  • Real time monitoring instrumentation (supply, installation and Web based data management service) for critical sections and adjacent buildings 
  • Dilapidation (pre-construction building condition) survey of hundreds of buildings within zone of influence of excavation works and tunnel alignment
  • Supply and installation of geotechnical and geodetic monitoring instrumentation for underground stations and tunnels 
  • Supply and installation of geotechnical and geodetic monitoring instrumentation for sensitive buildings within  zone of influence of excavation works and tunnel alignment

Contract UGC-04 (Worli – Dharavi)

Tunnels and 3 stations at Siddhivinayak, Dadar & Shitaladevi

Contractor: Continental Engineering Corporation – ITD Cementation India Ltd – Tata Projects Ltd

Encardio-rite scope of works included:

  • Dilapidation (pre-construction building condition) survey of hundreds of buildings within zone of influence of excavation works and tunnel alignment
  • Supply and installation of geotechnical and geodetic monitoring instrumentation for underground stations and tunnels 
  • Supply and installation of geotechnical and geodetic monitoring instrumentation for sensitive buildings within  zone of influence of excavation works and tunnel alignment
  • Monitoring services with daily, weekly  and monthly monitoring

Contract UGC-05 (Dharavi – Domestic Airport)

Tunnels and 4 stations at Dharavi, BKC, Vidyanagri, Santa Cruz

Contractor: J. Kumar Infraprojects Ltd – China Railway No.3 Engineering Group Co. Ltd

Encardio-rite scope of works included:

  • Real time monitoring instrumentation (supply, installation and Web based data management service) for critical sections and adjacent buildings 
  • Supply of geotechnical and geodetic monitoring instrumentation for underground stations and tunnels 
  • Supply of geotechnical and geodetic monitoring instrumentation for sensitive buildings within  zone of influence of excavation works and tunnel alignment

Contract UGC-06 (Domestic Airport – Marol Naka)

Tunnels and 3 stations at T1 CSI Airport , Sahar Road & T2 CSI Airport

Contractor: J. Kumar Infraprojects Ltd – China Railway No.3 Engineering Group Co. Ltd

Encardio-rite scope of works included:

  • Supply of geotechnical and geodetic monitoring instrumentation for underground stations and tunnels 
  • Supply of geotechnical and geodetic monitoring instrumentation for sensitive buildings within  zone of influence of excavation works and tunnel alignment

Contract UGC-07 (Marol Naka – SEEPZ)

Tunnels and 3 stations at Marol Naka, MIDC & SEEPZ

Contractor: Larsen & Toubro Ltd/Shanghai Tunnel Engineering Co. Ltd

Encardio-rite scope of works included:

  • Real time monitoring instrumentation (supply, installation and Web based data management service) for critical sections and adjacent buildings 
  • Dilapidation (pre-construction building condition) survey of hundreds of buildings within zone of influence of excavation works and tunnel alignment
  • Supply and installation of geotechnical and geodetic monitoring instrumentation for underground stations and tunnels 
  • Supply and installation of geotechnical and geodetic monitoring instrumentation for sensitive buildings within  zone of influence of excavation works and tunnel alignment